Javascript DHTML Drop Down Menu Powered by dhtml-menu-builder.com

HEAVY CIVIL / FACILITIES BUILDING CONSTRUCTION

 

ABOUT US  |  SERVICES  |  PROJECTS  |  ESTIMATING  |  COMPANY INFORMATION

P R O J E C T S

Burr Construction, Inc. provided Quality Control Management for the replacement of the waterline along Coast Road thru to Ocean Avenue at Vandenberg AFB, CA.  This project required abandonment in-place of the existing 14” RCP Pipeline and replacement of a new 14” c905 CL 235 PVC waterline.  All connections to the existing waterline (tees, services, pressure relief valves, cattle troughs) will be re-piped to connect to the new waterline.  Since this waterline was within the right-of-way of the tow route for the Evolved Expandable Launch Vehicle (EELV) program, temporary stops in work performance coupled with the placement of steel plates along any open sections of the waterline trenches were often required. This project included coordination with on-site Natural Resource and Cultural Resource Specialists to ensure environmental protection sensitive area. 

 

Replace Waterline Along Coast Road to Ocean Ave

Vandenberg AFB, CA

U.S. Army Corps of Engineers

click to zoom image

$2,958,490 - Completed 2010

O U T S T A N D I N G

 

 

 

 

 

Final CCASS Evaluation

from Owner